Home / Landmark Projects / Expanding Terminal 1B without stopping Mumbai’s airport
Expanding Terminal 1B without stopping Mumbai’s airport

Expansion & technology modernisation inside a live, operational, high security domestic terminal

Expanding Terminal 1B without stopping Mumbai’s airport

Share this Case Study:

Project Context

The rapid surge in domestic aviation traffic necessitated the immediate expansion and modernisation of Terminal 1B at Chhatrapati Shivaji International Airport, Mumbai.

Commissioned to upgrade passenger throughput, the project required comprehensive structural and civil works, advanced MEP integration, and premium interior transformations without causing service disruptions to the LIVE operations of the active domentic airport.

The strategic objective was to scale check-in, baggage handling, and transit capacities to international standards, serving as a critical nation-building asset for India's financial capital.

Structural Reinforcement

01 / Structural Reinforcement

Continuous Operations

02 / Continuous Operations

Modernized Standards

03 / Modernized Standards

Execution Challenge

The primary constraint involved executing heavy structural interventions, including installing pillar-less check-in halls and massive Kalzip roofing, within a high-security, live environment processing millions of active passengers.

Traditional linear sequences were unviable due to a strict zero-downtime operational mandate.

Logistical footprint limitations, tight night windows, unmapped services, and severe structural safety requirements demanded flawless coordination across regulatory aviation authorities, airport operators, and independent engineering consultants.

Strategic Role

As executive lead, Mr Avarrsekar directed the pre-bid positioning strategy, mapping the firm's rapid mobilisation and technical engineering capabilities directly to complex aviation evaluation criteria.

He established a centralised project governance and risk oversight matrix to balance intense operational accountability.

Executing his visionary leadership and infra governance excellence, Mr Avarrsekar served as the primary interface with airport operators and regulatory bodies.

He decoupled field engineering from administrative friction, fast-tracking approvals to ensure absolute compliance with compressed schedules.

Actions Taken

- Understook a micro-scheduled parallel workflow that separated expansion work from passenger areas.

- Installed wide-span steel structures and Kalzip roofing during night windows.

- Integrated automated baggage handling, CCTV surveillance and high-volume HVAC.

- Enforced dust-insulated and acoustic containment to protect operational areas.

- Managed just-in-time logistics across airside and landside constraints.

Outcome

Owing to the successful turnaround expansion, Terminal 1B now has 80 modernized check-in counters, upgraded baggage processing and improved transit infrastructure, delivered without disrupting aviation operations.

Executed with zero disruption to active aviation operations, the project sets a definitive industry standard for brownfield aviation upgrades inside live airports.

It demonstrates how aligning multi-disciplinary engineering mastery with rigid bid criteria drives predictable asset performance, mitigates complex regulatory risks, and secures lucrative public infrastructure mandates. The project is a working reference for brownfield upgrades inside live airports.

Technical Data of Record

Scope of Work

Expansion of the domestic terminal: 80 check-in counters, pillar-less wide-span structures, Kalzip roofing, lounges, baggage make-up and claim loops, and integrated MEP and CCTV.

Key Specifications & Challenges

Wide-span steel frames, Kalzip aluminium standing-seam roofing, CCTV integration and automated baggage loops. Heavy steel work over a live terminal, airside and landside logistics, multi-agency clearances and BCAS compliance.

Major Deliverables

An 80-counter check-in concourse, upgraded arrival and departure zones, baggage sorting loops, VIP lounges and mezzanine dining.

Result

Delivered with no disruption to operations, supported by ultrasonic weld testing and continuous geodetic monitoring.

Client

Airport Authority of India. Location: Santacruz, Mumbai.

Location

Chhatrapati Shivaji International Airport (CSIA) Terminal 1B, Santacruz, Mumbai, India.

Discover the Full Strategy

Explore the detailed methodologies, execution frameworks, and deep-dive analytics in our comprehensive case study.

Request the Project Case Study
Popular Project

Popular Project

Turnkey construction of the High Court Circuit Bench building, Gulbarga, Karnataka